Case Study – Northcote Aquatic and Recreation Centre.

12 Jan 2024
CAG

Project

Northcote Aquatic and Recreation Centre – VIC

Industry

Sports & Recreation

Project Details

In 2021, construction commenced on the $59 million project to deliver the Northcote Aquatic and Recreation Centre (NARC).

The new aquatic centre has indoor and outdoor pools as well as increased opportunities to participate in health and wellbeing activities, through larger and additional programming spaces and an added warm water pool for exercise and rehabilitation.

NARC is a 6 Star Green Star rated facility, demonstrating The City of Darebin’s commitment to and leadership in climate action and in delivering innovative environmentally sustainable projects.

The design was shaped by consultation with the community and the Wurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation and has been completed by Architects, Warren and Mahoney and Kane Construction.

The project reached Practical Completion in October 2023.

Key Deliverables

Classic Architectural group was engaged by Kane Construction to supply and install a variety of products from our extensive range, this included Integra Entrance Matting, Tredfx Safety Stair Nosings and Tactiles, Bike Racks and Car Park Bollards. Our team also conducted extensive LRV testing onsite, ensuring all installed Classic products met the required safety standards.

A requirement from the City of Darebin included a preference for suppliers based within the Darebin area. With Classic being Preston based we easily ticked that box and enjoyed being able to see the progress of the project, located just down the road from our office.

The City of Darebin also required the project to meet a 6-Star Green Star sustainability rating – a demanding target for aquatic facilities. This was achieved using a wide range of techniques including large scale photovoltaic arrays on roof surfaces and carefully selected products and materials throughout the build.

LocationNorthcote, VIC
Value$59M
BuilderKane Construction
ArchitectWarren and Mahoney
Completion DateOctober 2023

Key Stats

The project includes:

Indoor

  • 8 lane 25m pool
  • Learn to swim/leisure pool
  • An aquatic playground and toddler pool
  • Warm water pool
  • Steam, spa and sauna facilities
  • Gym and group fitness studios
  • Private consult rooms
  • Café; and
  • Change rooms include dedicated spaces for accessibility, gender-neutral, changing place, and school groups

Outdoor

  • 10 lane 50m pool with ramp entry
  • Landscaped spectator area for carnivals and events
  • Nature play acquatic playground

Access & Car Parking

  • New entry and exit to car park
  • Electric vehicle charging stations
  • Increased bicycle parking and bus parking
  • Pick up / drop off zone

Supplied and Installed

Entrance Matting

  • Classic Integra Vantt 5500

Stair Nosings

  • Classic Tredfx IKB140
  • Classic Tredfx SNR019
  • Classic Tredfx GKR030

Tactiles

  • Classic Tredfx PT30A
  • Classic Tredfx SH10N

Floor Trims

  • Classic Tredfx TRP44R

Car Park

  • Classic Bollards Surface Mount
  • Classic Bollards Collapsible

Bike Racks

  • Classic Hoop Style

Image Credits: Pixel Collective & Warren and Mahoney

Get industry and product news delivered to your inbox monthly

Visualise Your Product in 3D
See how the Classic 3D/AR Technology can revolutionise your product selections.
Need A Quote? Get in Touch With Us

Related Articles.

View all News
Case Study – Bendigo Law Courts
Project Bendigo Law Courts Industry Legal & Military Project...
Case Study – Parliament Chambers Refurbishment
Project Parliament Chambers Refurbishment – NSW Industry Legal &...
Case Study – 443 Queen Street
Project 443 Queen Street Industry Residential & Hospitality Project...

Chat with our specialists about your next project.

Call Classic Architectural Group today on 1300 244 377

New Product Catalogue Available
Download or request a physical copy