Wenona School.

This project involved the construction of a state-of-the-art Science, Technology, Engineering and Mathematics (STEM) teaching and sports hub at Wenona School. Critical in both its amenity for the students and to the School in its aim to educate and empower young women, the facility includes laboratories and food technology kitchens and flexible study areas. A key feature of this project is the aquatic centre with a 25-metre pool and a 15-metre learn to swim area.

Industry
  • Education
Location
  • New South Wales
Builder
  • Kane Constructions
Architect
  • Tonkin Zulaikha Greer Architects
Photographer
  • Kane Constructions

Products Used.

Stair Nosings

SNR019

Aluminium – hard wearing
Surface mount applications
Interior and exterior use
  •   icon-badge-lifetime-warranty
  •   icon-badge-fire-resistant
  •   icon-badge-p4
Tactile Indicators

SH75N

Grooved 10 ring polyurethane insert
Rear nylon stud
Interior and exterior use
  •   icon-badge-lifetime-warranty
  •   icon-badge-p5
  •   icon-badge-installation
Stair Nosings

3M General Purpose Tape

Self adhesive, slip resistant material
Surface mount applications
Interior and exterior use
  •   icon-badge-2year-warranty
  •   icon-badge-fire
  •   icon-badge-p5

Trusted by you for over 40 years

Stay connected with us on social media to discover firsthand testimonials from our valued customers sharing their experiences with Classic.

, View all Testimonials

Chat with our specialists about your next project.

Call Classic Architectural Group today on 1300 244 377

New Product Catalogue Available
Download or request a physical copy