Case Study – Northern Hospital.

02 May 2023
CAG

Project

Northern Hospital

Industry

Health

Project Details

Classic was engaged in the 2nd stage of the Northern Hospital Inpatient Expansion  project in the third quarter of 2019.

With the demand for quality healthcare continuing to rise in Melbourne’s fast-growing northern growth corridor, the Northern Hospital has undergone a major rebuild and refurbishment.

This two-stage project allows Northern Health to ensure that families have access to first-class care close to home. The works started in July 2019 and the main tower and infill building works concluded at the end of 2020. Refurbishment works to the new Recovery Ward expansion continued into mid-2021.

The Northern Hospital Inpatient Expansion adds an additional 4-levels to the existing hospital creating space for three 32-bed wards accommodating 96 acute inpatient beds, three new operating theatres including one hybrid theatre, a critical care unit, a new Central Sterile Supply Department (CSSD), as well as laying the foundations for future additional expansion.

CAG Key Deliverables

Classic Architectural Group supplied and installed entrance matting, tactiles and stair nosings for the project.

LocationEpping, Victoria
Value$195M
BuilderKane Construction
ArchitectMGS Architects
ImagesKane Construction
Completion DateJuly 2021

Key Stats

Features of the new development include:

  • Three 32-bed wards accommodating 96 acute in-patient beds
  • Level 6 Pandemic Ward
  • Three new operating theatres including one hybrid theatre
  • New theatre recovery spaces
  • Expansion of cardiology services, cath labs and medical imaging
  • A Critical Care Unit with provision for development of a cardiac precinct
  • A fitted out ground floor with kitchen, café hub, offices, transit lounge, emergency control room, morgue and communications rooms
  • New electrical and lift infrastructure
  • Future provision for a helipad
  • A new Central Sterile Supply Unit
  • Equipment loan centre
  • Bio-medical engineering
  • Loading dock
  • Back office functions

Supplied and Installed

Entrance Matting

  • Classic Vantt 5500

Tactiles

  • Classic Tredfx PH06P
  • Classic Tredfx Fastile PT30A

Stair Nosings

  • Classic Tredfx DKR104

Get industry and product news delivered to your inbox monthly

Visualise Your Product in 3D
See how the Classic 3D/AR Technology can revolutionise your product selections.
Need A Quote? Get in Touch With Us

Related Articles.

View all News
Case Study – Quay Quarter Tower
Project Quay Quarter Tower Industry Office Project Details Quay...
Case Study – Metro Rail Tunnel Part 1 & 2
Credit – Victoria’s Big Build, Vic Gov Project Metro...
Case Study – St Leonard’s College
Project St Leonard’s College Industry Education Project Details The...

Chat with our specialists about your next project.

Call Classic Architectural Group today on 1300 244 377

New Product Catalogue Available
Download or request a physical copy